MALEG demonstrator commissioned in the lab at Fraunhofer ISE, Freiburg
The installation of the MALEG demonstrator and the implementation of the operational software are finished. The demonstrator was successfully commissioned in the Fraunhofer ISE labs.
2nd General Assembly
The consortium was meeting at Fraunhofer ISE premises in Freiburg, Germany. The visit of the Fraunhofer ISE laboratories and workshops and the introduction to the demonstration plant’s conceptual design, interfacial requirements and capabilities was an important part of the work program.
Initial sampling campaign finished
An initial sampling campaign was performed on two MALEG demonstration sites in Unterschleißheim and Haag am Hausruck. Samples for a complete liquid and gas analysis were taken and analyzed in the Hydroisotop labs to determine the initial chemical conditions at the different geothermal power plants.
Kick-off meeting
As one of the leading project management organizations in Germany, we work hand in hand with public authorities in the topics of science, industry, and policy-making.